Template:M gen 1992 ISDA 11

From The Jolly Contrarian
Jump to navigation Jump to search

Applies to Events of Default, not Termination Events

This section applies only following an Event of Default, and not on a termination following an Termination Event. There is some cognitive dissonance there: while Events of Default in the main are meant to be more worthy of outrage than Termination Events — thereby justifying stentorian measures to recover losses and costs as a result — some Termination Events, and most Additional Termination Events — are credit- and solvency-related, thus equally deserving of the kind of opprobrium that would warrant on on-slapping of an indemnity.