83,489
edits
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{a|devil|}} | {{a|devil|}} | ||
*[[Know your purpose]] | *[[Know your purpose]] | ||
*[[Assume there will be accidents]]: The role of the risk manager is to know where the risks are concentrated, not to be satisfied there are no risks. If your [[RAG status]] has been uniformly green at every [[opco]] for the last ten years you should get your coat. Because either there ''is no'' [[risk]], so what are you even doing chairing an [[opco]], or you are flat-out delusional, so someone ''else'' is needed. | |||
*[[Design for average people]]: be realistic about your people's capability: they will be, on average, ''average''. | *[[Design for average people]]: be realistic about your people's capability: they will be, on average, ''average''. | ||
*[[Amplify signal, minimise noise]] | *[[Amplify signal, minimise noise]] |