5(b)(v) - ISDA Provision

Revision as of 16:13, 26 July 2012 by Amwelladmin (talk | contribs) (Created page with "{{isdadisambiguation|Additional Termination Event|Credit Event Upon Merger}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Numbering Discrepancy: Note the numbering discrepancy in Section 5(b) between the 1992 ISDA and 2002 ISDA. This is caused by a new 5(b)(ii) (Force Majeure Event) in the 2002 ISDA before Tax Event, which is thus shunted from Section 5(b)(ii) (in the 1992 ISDA) to Section 5(b)(iii) (in the 2002 ISDA).

Depending on your edition of the ISDA Master Agreement, “{{{3}}}” could be a reference to: