|
|
(16 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| {{1995 CSA Section 6 TOC}} | | {{Manual|MCAE|1995|6|Paragraph|7|short}} |
| {{csasnap|6}}
| |
| ====Discussion===
| |
| Consider expanding of the Default provision under Paragraph {{csaprov|6}} of the {{tag|CSA}} to include Termination Events where all {{isdaprov|Transactions}} are {{isdaprov|Affected Transaction}}s. This is as per Section 3.2 of the 2001 ISDA Margin Provisions in which it is recommended that Paragraph {{csaprov|6}} of the {{tag|CSA}} should apply where all transactions are closed out resulting from of an {{isdaprov|Event of Default}} or Specified Condition. Specified Condition is defined to include the {{isdaprov|Termination Events}} listed under the {{isdama}}. It is likely that all transactions would be {{isdaprov|Affected Transactions}} should a {{isdaprov|Credit Event Upon Merger}} or {{isdaprov|Additional Termination Event}} occur.
| |
| {{csaanatomy}}
| |