Force Majeure Event - ISDA Provision: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 1: Line 1:
{{ISDAnumberingdiscrepancy}}
{{ISDAnumberingdiscrepancy}}
{{isdasnap|5(b)(ii)}}
{{subs:isdasnap|5(b)(ii)}}


Note that, while the {{1992ma}} does not contain the concept of Force Majeure, there is an [[ISDA Illegality/Force Majeure Protocol]] (see [http://www.isda.org/2012illegalityprot/docs/ISDA_Protocol_-_Adoption_of_2002_Illegality_FM_provisions_Final.pdf here]) which can be signed to adopt/incorporate the relevant parts:
Note that, while the {{1992ma}} does not contain the concept of Force Majeure, there is an [[ISDA Illegality/Force Majeure Protocol]] (see [http://www.isda.org/2012illegalityprot/docs/ISDA_Protocol_-_Adoption_of_2002_Illegality_FM_provisions_Final.pdf here]) which can be signed to adopt/incorporate the relevant parts: