Seven wastes of negotiation: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 17: Line 17:
*'''{{wasteprov|Defects}}''': Products that don’t work as billed and which may require replacement or re-tooling. Consider the factors that lead to defects: complexity in the product design and manufacturing process. Which is more likely to break down, and what would you rather fix: a Range Rover Evoque, or a 1982 [[Toyota Hilux]]?
*'''{{wasteprov|Defects}}''': Products that don’t work as billed and which may require replacement or re-tooling. Consider the factors that lead to defects: complexity in the product design and manufacturing process. Which is more likely to break down, and what would you rather fix: a Range Rover Evoque, or a 1982 [[Toyota Hilux]]?


===In detail===
Anyway, with that intro here, with feeling, are the seven wastes, as applied to contract [[negotiation]]:
{{Overproduction}}
{{Waiting}}
{{Transporting}}
{{Over-processing}}
{{Inventory}}
{{Motion}}
{{Defects}}
{{sa}}
{{sa}}
*[[A faster horse - technology article]]
*[[A faster horse - technology article]]
*{{wasteprov|Cost}}
*{{wasteprov|Cost}}
{{ref}}
{{ref}}