82,891
edits
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) |
||
Line 1: | Line 1: | ||
==={{wasteprov|Inventory}}=== | ==={{wasteprov|Inventory}}=== | ||
'''Headline''': Usually a second-order [[waste]], where there are | '''Headline''': Work in progress. Usually a second-order [[waste]], where there are bottlenecks on your production line and half-processed {{wasteprov|inventory}} stacks up waiting for the next step, meaning the real waste here is {{wasteprov|waiting}}, rather than {{wasteprov|inventory}} ''per se''. | ||
In the context of contract {{tag|negotiation}}, inventory is coterminous with {{wasteprov|waiting}} — not being a [[bearer instrument]], a legal {{tag|contract}} has no intrinsic value even when completed — it is what you do ''with'' it that creates the risk and reward — so having a hopper overflowing with half-completed [[credit support annex|credit support annexes]] does not of itself represent a large waste. But the fact that they are stacked up waiting for an | But time is money, so the longer the overall negoation process, the more expensive the {{wasteprov|inventory}}. | ||
In the context of contract {{tag|negotiation}}, inventory is coterminous with {{wasteprov|waiting}} — not being a [[bearer instrument]], a legal {{tag|contract}} has no intrinsic value even when completed — it is what you do ''with'' it that creates the risk and reward — so having a hopper overflowing with half-completed [[credit support annex|credit support annexes]] does not of itself represent a large waste. But the fact that they are stacked up waiting for someone to answer an email — be it the client, trading, risk or credit — it stretches out the production time. |