Template:Isda 6(e) comp

Revision as of 16:58, 1 January 2024 by Amwelladmin (talk | contribs) (Created page with "{{Isda 6(e)(i) comp|isdaprov}} {{Isda 6(e)(ii) comp|isdaprov}} {{Isda 6(e)(iii) comp|isdaprov}} {{Isda 6(e)(iv) comp|isdaprov}} {{Isda 6(e)(v) comp|isdaprov}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Compare with Close-out Amount under the 2002 ISDA

The 1992 ISDA close-out methodology is hideous. They overhauled whole process of closing out an ISDA, soup to nuts, in the 2002 ISDA, and is now much more straightforward — as far as you could ever say that about ISDA’s crack drafting squad™’s output. But a large part of the fanbase — that part west of Cabo da Roca — sticks with the 1992 ISDA. Odd. {{subst:M comp disc 1992 ISDA 6(e)(ii)}} Template:Isda 6(e)(iii) comp Template:Isda 6(e)(iv) comp Template:Isda 6(e)(v) comp