Template:M comp disc 1992 ISDA Force Majeure Event

Revision as of 09:49, 13 April 2020 by Amwelladmin (talk | contribs)
Numbering Discrepancy: Note the numbering discrepancy in Section 5(b) between the 1992 ISDA and 2002 ISDA. This is caused by a new 5(b)(ii) (Force Majeure Event) in the 2002 ISDA before Tax Event, which is thus shunted from Section 5(b)(ii) (in the 1992 ISDA) to Section 5(b)(iii) (in the 2002 ISDA).

Note that, while the 1992 ISDA does not contain the concept of force majeure, there is an ISDA Illegality/Force Majeure Protocol (see here) which can be signed to adopt/incorporate the relevant parts.