Template:M comp disc 2002 ISDA 5(b)(ii)

Revision as of 16:44, 18 March 2020 by Amwelladmin (talk | contribs) (Created page with "{{ISDAnumberingdiscrepancy}} Note that, while the {{1992ma}} does not contain the concept of force majeure, there is an ISDA Illegality/Force Majeure Protocol (see [h...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Numbering Discrepancy: Note the numbering discrepancy in Section 5(b) between the 1992 ISDA and 2002 ISDA. This is caused by a new 5(b)(ii) (Force Majeure Event) in the 2002 ISDA before Tax Event, which is thus shunted from Section 5(b)(ii) (in the 1992 ISDA) to Section 5(b)(iii) (in the 2002 ISDA).

Note that, while the 1992 ISDA does not contain the concept of force majeure, there is an ISDA Illegality/Force Majeure Protocol (see here) which can be signed to adopt/incorporate the relevant parts.