82,891
edits
Amwelladmin (talk | contribs) (Created page with "There is no “Local Delivery Day” concept in the {{1992ma}}. Of its two appearances in the {{2002ma}} one — in {{isdaprov|Failure to Pay or Deliver}} — is ably handled by Local ''Business'' Day, and the other in deferral following a {{isdaprov|Waiting Period}} — doesn’t exist, being part of the {{isdaprov|Illegality}}/{{isdaprov|Force Majeure}} innovation complex from the 2002.") |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
There is no “Local Delivery Day” concept in the {{1992ma}}. Of its two appearances in the {{2002ma}} one — in {{isdaprov|Failure to Pay or Deliver}} — is ably handled by [[Local Business Day - 1992 ISDA Provision|Local ''Business'' Day]], and the other in deferral following a {{isdaprov|Waiting Period}} — doesn’t exist, being part of the {{isdaprov|Illegality}}/{{isdaprov|Force Majeure}} innovation complex from the 2002. | [[Local Delivery Day - ISDA Provision|There]] is no “Local Delivery Day” concept in the {{1992ma}}. Of its two appearances in the {{2002ma}} one — in {{isdaprov|Failure to Pay or Deliver}} — is ably handled by [[Local Business Day - 1992 ISDA Provision|Local ''Business'' Day]], and the other in deferral following a {{isdaprov|Waiting Period}} — doesn’t exist, being part of the {{isdaprov|Illegality}}/{{isdaprov|Force Majeure}} innovation complex from the 2002. |