Amwelladmin (talk | contribs) (Created page with "Much of this, we feel, is configuring a sale or option contract in an underlying that is more like a financial instrument than a commodity into the wiring of a master agreement that is designed to cater for the sale and trading of power, which is a curious type of commodity in that it doesn’t have an articulated unit, but is a free-flowing source of energy measured more by its...") |
Amwelladmin (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Primary Obligations for Delivery and Acceptance of Allowances - EFET Allowance Provision|Much]] of this, we feel, is configuring a sale or option contract in an underlying that is more like a financial instrument than a commodity into the wiring of a master agreement that is designed to cater for the sale and trading of power, which is a curious type of commodity in that it doesn’t have an articulated unit, but is a free-flowing source of energy measured more by its volume. This all this business about nominating {{efetaprov|Delivery Point}}s and {{efetaprov|Transfer Point}}s doesn’t really make a lot of sense when you are delivering a dematerialised certificate from one custody account to another, and not sending volts through an electricity grid. | [[Primary Obligations for Delivery and Acceptance of Allowances - EFET Allowance Provision|Much]] of this, we feel, is configuring a sale or option contract in an underlying that is more like a financial instrument than a commodity into the wiring of a master agreement that is designed to cater for the sale and trading of power, which is a curious type of commodity in that it doesn’t have an articulated unit, but is a free-flowing source of energy measured more by its volume. This all this business about nominating {{efetaprov|Delivery Point}}s and {{efetaprov|Transfer Point}}s doesn’t really make a lot of sense when you are delivering a dematerialised certificate from one custody account to another, and not sending volts through an electricity grid. | ||
===={{efetaprov|4.1}} Delivery, Acceptance and Scheduling Obligations ==== | |||
{{M summ EFET Allowance Annex 4.1}} (That “whereupon” is in Clause {{efetaprov|6.1}} of the {{efeta}}, by the way.) | |||
===={{efetaprov|4.2}} Definition of Schedule ==== | |||
{{M summ EFET Allowance Annex 4.2}} | |||
===={{efetaprov|4.3}} Physical Settlement Netting ==== | |||
{{M summ EFET Allowance Annex 4.3}} | |||
===={{efetaprov|4.4}} Payment for Allowances ==== | |||
{{M summ EFET Allowance Annex 4.4}} |