Template:Transport: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 1: Line 1:
==={{wasteprov|Transport}}===
==={{wasteprov|Transport}}===
'''Headline''': ''[[Escalation]]s and reporting are the “transport” of a [[negotiation]] process: they may be automated, but ideally should be avoided (where possible) by robust redesign of the contract production process.'' <br>
'''''Headline''': [[Escalation]]s and reporting are the “transport” of a [[negotiation]] process: they may be automated, but ideally should be avoided (where possible) by robust redesign of the contract production process.'' <br>


In physical manufacture, our man [[Doctor Ohno]] recognised that {{wasteprov|Transport}} product between processes during manufacture incurs cost and adds no value. The answer is to reconfigure the production line to get all the inputs at the right time and sequence. Contract negotiations are no different. The hand-offs may be electronic, but the waiting is inevitable. They arise in:
In physical manufacture, our man [[Doctor Ohno]] recognised that {{wasteprov|Transport}} product between processes during manufacture incurs cost and adds no value. The answer is to reconfigure the production line to get all the inputs at the right time and sequence. Contract negotiations are no different. The hand-offs may be electronic, but the waiting is inevitable. They arise in: