Template:EFET Allowance Annex 7.3: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

5 September 2023

  • curprev 16:1316:13, 5 September 2023Amwelladmin talk contribs 975 bytes +14 No edit summary
  • curprev 16:1316:13, 5 September 2023Amwelladmin talk contribs 961 bytes −1 No edit summary
  • curprev 12:5912:59, 5 September 2023Amwelladmin talk contribs 962 bytes +962 Created page with ":§ 7.3 '''{{efetaprov|Notification and Mitigation of Force Majeure}}'''. The first Party learning of the occurrence of an event of {{efetaprov|Force Majeure}} shall, as soon as practicable, notify the other Party of the commencement of {{efetaprov|Force Majeure}}. Each Party shall then undertake in good faith to determine, and notify the other Party with, to the extent then available, a non-binding estimate of the extent and expected duration of the {{efetaprov|Force Ma..."