Template:M summ 2002 ISDA 5(b)(i): Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
==={{isdaprov|Illegality}} vs. {{isdaprov|Force Majeure}} smackdown=== | ==={{isdaprov|Illegality}} vs. {{isdaprov|Force Majeure}} smackdown=== | ||
Like a {{isdaprov|Force Majeure Event}}, an {{isdaprov|Illegality}} may only be triggered after exhausting the fallbacks and remedies specified in the {{2002ma}}. | Like a {{isdaprov|Force Majeure Event}}, an {{isdaprov|Illegality}} may only be triggered after exhausting the fallbacks and remedies specified in the {{2002ma}}. | ||
==={{isdaprov|Hierarchy of Events}}=== | ==={{isdaprov|Hierarchy of Events}}=== | ||
Under the {{2002ma}}, Section {{isdaprov|5(c)}} (''{{isdaprov|Hierarchy of Events}}'') intervenes to provide that (i) {{isdaprov|Illegality}} trumps {{isdaprov|Force Majeure}} and (ii) {{isdaprov|Illegality}} and {{isdaprov|Force Majeure}} both trump the {{isdaprov|Failure to Pay}} and {{isdaprov|Breach of Agreement}} {{isdaprov|Events of Default}}. Given that {{isdaprov|Illegality}} is no longer subject to the | Under the {{2002ma}}, Section {{isdaprov|5(c)}} (''{{isdaprov|Hierarchy of Events}}'') intervenes to provide that (i) {{isdaprov|Illegality}} trumps {{isdaprov|Force Majeure}} and (ii) {{isdaprov|Illegality}} and {{isdaprov|Force Majeure}} both trump the {{isdaprov|Failure to Pay}} and {{isdaprov|Breach of Agreement}} {{isdaprov|Events of Default}}. Given that {{isdaprov|Illegality}} is no longer subject to the “two {{isdaprov|Affected Parties}}” delay on termination (as it was in the {{1992ma}}), this is significant. |
Revision as of 16:17, 10 April 2020
Illegality vs. Force Majeure smackdown
Like a Force Majeure Event, an Illegality may only be triggered after exhausting the fallbacks and remedies specified in the 2002 ISDA.
Hierarchy of Events
Under the 2002 ISDA, Section 5(c) (Hierarchy of Events) intervenes to provide that (i) Illegality trumps Force Majeure and (ii) Illegality and Force Majeure both trump the Failure to Pay and Breach of Agreement Events of Default. Given that Illegality is no longer subject to the “two Affected Parties” delay on termination (as it was in the 1992 ISDA), this is significant.