Closing out an ISDA: Difference between revisions

From The Jolly Contrarian
Jump to navigation Jump to search
No edit summary
Redirected page to Closing out a 2002 ISDA
Tag: New redirect
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
''See: Section {{isdaprov|6}} of the {{isdama}}.''
#redirect[[Closing out a 2002 ISDA]]
 
#On what {{isdaprov|Event of Default}} or {{isdaprov|Termination Event}} are you relying? With a fair wind it will be {{isdaprov|Failure to Pay or Deliver}}. Assuming so: <br>
{{failure to pay procedure}}

Latest revision as of 11:26, 4 December 2023