Template:EUA Annex Cost of Carry Rate: Difference between revisions

From The Jolly Contrarian
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''{{euaprov|Close-out Cost of Carry Rate}}''': Means a rate equal to the {{isdadefsprov|Floating Rate}} that would be determined for the period from the scheduled {{euaprov|Payment Date}} to the {{isdaprov|Early Termination Date}}, if the {{euaprov|Reset Date}} were the date that would be the {{euaprov|Payment Date}} if delivery had been made on the {{euaprov|Final Delivery Date}} or {{euaprov|Final Compliance Date}} ([[as the case may be]]) and the applicable {{isdadefsprov|Floating Rate Option}} were “EUR-EONIA-OIS-COMPOUND”. <br>
'''{{euaprov|Cost of Carry Rate}}''': Means a rate equal to the {{isdadefsprov|Floating Rate}} that would be determined for a {{isdadefsprov|Calculation Period}} commencing on (and including) the scheduled {{euaprov|Payment Date}} and ending on (but excluding) the {{euaprov|Delayed Payment Date}}, if the {{euaprov|Reset Date}} were the last day of that {{isdadefsprov|Calculation Period}} and the applicable {{isdadefsprov|Floating Rate Option}} were “EUR-EONIA-OIS-COMPOUND”. <br>

Latest revision as of 14:12, 27 June 2024

Cost of Carry Rate: Means a rate equal to the Floating Rate that would be determined for a Calculation Period commencing on (and including) the scheduled Payment Date and ending on (but excluding) the Delayed Payment Date, if the Reset Date were the last day of that Calculation Period and the applicable Floating Rate Option were “EUR-EONIA-OIS-COMPOUND”.