Closing out an ISDA: Difference between revisions

From The Jolly Contrarian
Jump to navigation Jump to search
No edit summary
Redirected page to Closing out a 2002 ISDA
Tag: New redirect
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{a|isda|[[File:Claudis Blankie.jpg|center|450px|thumb|An ISDA in dire need of a good hard Section {{isdaprov|6(e)}} notice, yesterday.]]}}''See: Section {{isdaprov|6}} of the {{isdama}}.''
#redirect[[Closing out a 2002 ISDA]]
 
On what {{isdaprov|Event of Default}} or {{isdaprov|Termination Event}} are you relying? With a fair wind it will be {{isdaprov|Failure to Pay or Deliver}}. Assuming so:
 
==={{2002ma}}===
{{failure to pay procedure|isdaprov}}
 
==={{1992ma}}===
Much the same, but with different hyperlinks:
{{failure to pay procedure|isda92prov}}
{{ref}}

Latest revision as of 11:26, 4 December 2023