Template:M sa 2002 ISDA 6(e): Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) Created page with "*The difference between the Early Termination Amount and the Close-out Amount - ISDA Provision|The difference between “Early Termination Amount” and “Close-out Amount..." |
Amwelladmin (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{isda 6(e) sa|isdaprov}} |
Latest revision as of 20:33, 3 January 2024
- Close-out Amount (if you are a 2002 guy) or “the amount determined following early termination of a Terminated Transaction” if you’re one of those Burmese Jungle refusenik types still on the 1992 ISDA or (why not!!) earlier — being “the amount due upon termination of a single Transaction or (as the case may, from time to time and for the time being, be) group of Transactions)”.
- Early Termination Amount (if you are a 2002 guy) or “the amount determined to be payable following applications of the provisions of Section 6(e)” if you are a Burmese Jungler.