Template:M comp disc EFET Allowance Annex 4.1: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) Created page with "This is the correposponding provision to (d)(i)(2) of the {{emissionsannex}} and" |
Amwelladmin (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
This is the | [[Delivery, Acceptance and Scheduling Obligations - EFET Allowance Provision|This]] is the corresponding provision to {{euaprov|(d)(i)(2)}} of the {{emissionsannex}} and {{ietaprov|5.1(c)}} of the {{ietama}}. |
Latest revision as of 15:10, 13 September 2023
This is the corresponding provision to (d)(i)(2) of the ISDA EU Emissions Annex and 5.1(c) of the IETA Master Agreement.