Seven wastes of negotiation: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{a|negotiation|}} | {{a|negotiation|}} | ||
The [[Toyota Production System]] (TPS) was created by Toyota’s chief engineer [[Taiichi Ohno]] to eliminate [[waste]], called “muda.” [[Waste]] — as opposed to ''{{wasteprov|cost}}'', is the enemy on any production line: a process that is ''inherently necessary'' must add value, even if it is expensive<ref>If you can’t configure it so it costs less than the value it adds, consider why you are running the process ''at all'': you have a loser of a business.</ref> so you should be cool about paying a fair value for it. | The [[Toyota Production System]] (TPS) was created by Toyota’s chief engineer [[Taiichi Ohno]] to eliminate [[waste]], called “muda.” [[Waste]] — as opposed to ''{{wasteprov|cost}}'', is the enemy on any production line: a process that is ''inherently necessary'' must add value, even if it is expensive<ref>If you can’t configure it so it costs less than the value it adds, consider why you are running the process ''at all'': you have a loser of a business.</ref> so you should be cool about paying a fair value for it. | ||
Line 27: | Line 27: | ||
{{Motion}} | {{Motion}} | ||
{{Defects}} | {{Defects}} | ||
{{sa}} | |||
*[[A faster horse - technology article]] | |||
{{ref}} | {{ref}} |