Template:M summ 2002 ISDA Potential Event of Default: Difference between revisions

From The Jolly Contrarian
Jump to navigation Jump to search
Created page with "A {{isdaprov|Failure to Pay or Deliver}} with an unexpired grace period, or where the grace period has expired but the {{isdaprov|Non-defaulting Party}} hasn’t (yet)..."
 
No edit summary
Line 1: Line 1:
A {{isdaprov|Failure to Pay or Deliver}} with an unexpired [[grace period]], or where the [[grace period]] has expired but the {{isdaprov|Non-defaulting Party}} hasn’t (yet) given a notice of default actually [[Accelerate|accelerating]] the default into an actual {{isdaprov|Event of Default}}.
A {{isdaprov|Potential Event of Default}} is a {{isdaprov|Failure to Pay or Deliver}} with an unexpired [[grace period]], or where the [[grace period]] has expired but the {{isdaprov|Non-defaulting Party}} hasn’t (yet) given a notice of default actually [[Accelerate|accelerating]] the default into an actual {{isdaprov|Event of Default}}.

Revision as of 16:49, 13 March 2020

A Potential Event of Default is a Failure to Pay or Deliver with an unexpired grace period, or where the grace period has expired but the Non-defaulting Party hasn’t (yet) given a notice of default actually accelerating the default into an actual Event of Default.