Template:M premium 2002 ISDA Applicable Deferral Rate: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) Created page with "*Analysis of the three different Applicable Deferral Rates, and why the JC thinks you (and {{icds}} would have been much better just sticking with a published base rate and not bothering with all this engineering." |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
*Analysis of the three different Applicable Deferral Rates, and why the JC thinks you (and {{icds}} would have been much better just sticking with a published base rate and not bothering with all this engineering. | *Analysis of the three different Applicable Deferral Rates, and why the JC thinks you (and {{icds}}) would have been much better just sticking with a published base rate and not bothering with all this fusspot engineering. |
Latest revision as of 08:54, 5 June 2023
- Analysis of the three different Applicable Deferral Rates, and why the JC thinks you (and ISDA’s crack drafting squad™) would have been much better just sticking with a published base rate and not bothering with all this fusspot engineering.