Template:M comp disc 2002 ISDA 5(b)(ii): Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{ | {{isdadisambiguation|Tax Event|Force Majeure Event|5(b)(ii)}} | ||
Note that, while the {{1992ma}} does not contain the concept of [[force majeure]], there is an [[ISDA Illegality/Force Majeure Protocol]] (see [http://www.isda.org/2012illegalityprot/docs/ISDA_Protocol_-_Adoption_of_2002_Illegality_FM_provisions_Final.pdf here]) which can be signed to adopt/incorporate the relevant parts. | Note that, while the {{1992ma}} does not contain the concept of [[force majeure]], there is an [[ISDA Illegality/Force Majeure Protocol]] (see [http://www.isda.org/2012illegalityprot/docs/ISDA_Protocol_-_Adoption_of_2002_Illegality_FM_provisions_Final.pdf here]) which can be signed to adopt/incorporate the relevant parts. | ||