10(a)(ii) - GMRA Provision: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{gmraanat|10(a)(ii)}} | {{gmraanat|10(a)(ii)}} | ||
This is a "{{gmraprov|Failure to Deliver}}" {{gmraprov|Event of Default}} under the | This is a "{{gmraprov|Failure to Deliver}}" {{gmraprov|Event of Default}} under the [[GMRA]]. There are those who believe it is best left switched off. |
Latest revision as of 13:30, 14 August 2024
GMRA Anatomy™
|
This is a "Failure to Deliver" Event of Default under the GMRA. There are those who believe it is best left switched off.