Template:EFET Allowance Annex 7.5(d)
From The Jolly Contrarian
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
- (d) Cost of Carry on Delayed Deliveries. In the event that all or part of the Contract Quantity of a SE Affected Transaction is Transferred to Buyer on or before the Delayed Delivery Date, Buyer shall pay to Seller an additional amount (the “Cost of Carry Amount”) calculated at the Cost of Carry Rate for the Cost of Carry Calculation Period on the product of the number of Allowances so Transferred and the Contract Price for the relevant Allowance Transaction, divided by three hundred and sixty (360). Such Cost of Carry Amount shall be identified in the relevant invoice.