82,974
edits
Amwelladmin (talk | contribs) |
Amwelladmin (talk | contribs) |
||
Line 11: | Line 11: | ||
===Incorporating Force Majeure into the {{1992ma}}=== | ===Incorporating Force Majeure into the {{1992ma}}=== | ||
One can incorporating {{isdaprov|Force Majeure}} into the {{ | One can incorporating {{isdaprov|Force Majeure}} into the {{1992ma}} as long as you carry the concept through to its logical conclusion i.e.: | ||
*Include a {{isdaprov|Hierachy of Events}}; | *Include a {{isdaprov|Hierachy of Events}}; | ||
*Consider the impact re a deferral of {{isdaprov|Early Termination Amount}} etc. | *Consider the impact re a deferral of {{isdaprov|Early Termination Amount}} etc. |