Template:M comp disc EFET Allowance Annex 7.1: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 3: Line 3:
The equivalent under the {{emissionsannex}} is the {{euaprov|Settlement Disruption Event}} — so called because there is already a Force Majeure under the {{isdama}} so the ’squad had to call their version something else.
The equivalent under the {{emissionsannex}} is the {{euaprov|Settlement Disruption Event}} — so called because there is already a Force Majeure under the {{isdama}} so the ’squad had to call their version something else.


Here, for good order, is a comparison of Force Majeure under the {{efetannex}} and {{euaprov|Settlement Disruption Event}} under the {{emissionsannex}}.
Here, for good order, is a {{diff|77096|77095}} between {{efetaprov|Force Majeure}} under the {{efetannex}} and {{euaprov|Settlement Disruption Event}} under the {{emissionsannex}}.

Navigation menu