83,547
edits
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[Force Majeure - EFET Allowance Provision|Functionally]], the | [[Force Majeure - EFET Allowance Provision|Functionally]], the definitions of {{efetaprov|Force Majeure}} in the EFET and IETA versions, and {{euaprov|Settlement Disruption Event}} in the {{euadefs}} are the same. | ||
Here is a {{diff|77069|77068}} between IETA and EFET, and here is a {{diff||}} between EFET and ISDA. | |||
The differences are to account for the architecture and nomenclature of the different master agreements, though the IETA has a conflict clause favouring Suspension Event over Force Majeure/Settlement Disruption Event, which the EFET does not. | |||
The equivalent under the {{emissionsannex}} is the {{euaprov|Settlement Disruption Event}} — so called because there is already a Force Majeure under the {{isdama}} so the ’squad had to call their version something else. | The equivalent under the {{emissionsannex}} is the {{euaprov|Settlement Disruption Event}} — so called because there is already a Force Majeure under the {{isdama}} so the ’squad had to call their version something else. | ||
Here, for good order, is a {{diff|77096|77095}} between {{efetaprov|Force Majeure}} under the {{efetannex}} and {{euaprov|Settlement Disruption Event}} under the {{emissionsannex}}. | Here, for good order, is a {{diff|77096|77095}} between {{efetaprov|Force Majeure}} under the {{efetannex}} and {{euaprov|Settlement Disruption Event}} under the {{emissionsannex}}. |