Template:Isda 5(b)(v) comp

From The Jolly Contrarian
Revision as of 22:24, 13 October 2023 by Amwelladmin (talk | contribs) (Created page with "{{ISDAnumberingdiscrepancy}} Even before the {{2002ma}} was published it was common to upgrade the {{1992ma}} formulation to something resembling the glorious concoction that became Section {{isdaprov|5(b)(v)}} of the {{2002ma}}. The 1992 wording is a bit lame, really. On the other hand, you could count the number of times an {{isdama}} is closed out on account of {{isdaprov|Credit Event Upon Merger}} on the fingers of one hand, even if you had lost all the fingers on...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Numbering Discrepancy: Note the numbering discrepancy in Section 5(b) between the 1992 ISDA and 2002 ISDA. This is caused by a new 5(b)(ii) (Force Majeure Event) in the 2002 ISDA before Tax Event, which is thus shunted from Section 5(b)(ii) (in the 1992 ISDA) to Section 5(b)(iii) (in the 2002 ISDA).

Even before the 2002 ISDA was published it was common to upgrade the 1992 ISDA formulation to something resembling the glorious concoction that became Section 5(b)(v) of the 2002 ISDA. The 1992 wording is a bit lame, really.

On the other hand, you could count the number of times an ISDA Master Agreement is closed out on account of Credit Event Upon Merger on the fingers of one hand, even if you had lost all the fingers on that hand to an industrial accident. So — yeah.