Template:M comp disc 2002 ISDA Local Delivery Day: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

27 June 2023

  • curprev 09:0409:04, 27 June 2023Amwelladmin talk contribs 476 bytes +40 No edit summary
  • curprev 09:0409:04, 27 June 2023Amwelladmin talk contribs 436 bytes +436 Created page with "There is no “Local Delivery Day” concept in the {{1992ma}}. Of its two appearances in the {{2002ma}} one — in {{isdaprov|Failure to Pay or Deliver}} — is ably handled by Local ''Business'' Day, and the other in deferral following a {{isdaprov|Waiting Period}} — doesn’t exist, being part of the {{isdaprov|Illegality}}/{{isdaprov|Force Majeure}} innovation complex from the 2002."