Template:M summ 2002 ISDA Potential Event of Default

From The Jolly Contrarian
Revision as of 16:49, 13 March 2020 by Amwelladmin (talk | contribs) (Created page with "A {{isdaprov|Failure to Pay or Deliver}} with an unexpired grace period, or where the grace period has expired but the {{isdaprov|Non-defaulting Party}} hasn’t (yet)...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

A Failure to Pay or Deliver with an unexpired grace period, or where the grace period has expired but the Non-defaulting Party hasn’t (yet) given a notice of default actually accelerating the default into an actual Event of Default.