Template:M summ Equity Derivatives 12.9(a)(iii)

From The Jolly Contrarian
Revision as of 14:11, 19 May 2022 by Amwelladmin (talk | contribs) (Created page with "Not generally stipulated as an Additional Disruption Event because firstly it would only be relevant in a physically-settled swap, and for a host of reasons a physicsally sett...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Not generally stipulated as an Additional Disruption Event because firstly it would only be relevant in a physically-settled swap, and for a host of reasons a physicsally settled synthetic instrument is a bit of a contradiction in terms — and in any case a settlement failure due to illiquidity is a racingly certain prospect in certain stock lines, and is more the rule than the exception in others, and is generally dealt with through buy-ins.