Template:Nutshell Equity Derivatives 6.7(c)(ii)

From The Jolly Contrarian
Revision as of 15:20, 11 May 2022 by Amwelladmin (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
6.7(c)(ii)Postponement”, then Section 6.6 will apply when determining the relevant level on that Averaging Date as if it were a disrupted Valuation Date whether or not the deferred Averaging Date would fall on a date that already is an Averaging Date; or