Template:M gen 1992 ISDA 11: Difference between revisions

From The Jolly Contrarian
Jump to navigation Jump to search
(Created page with "{{M gen 2002 ISDA 11}}")
 
(No difference)

Latest revision as of 18:10, 27 March 2020

Applies to Events of Default, not Termination Events

This section applies only following an Event of Default, and not on a termination following an Termination Event. There is some cognitive dissonance there: while Events of Default in the main are meant to be more worthy of outrage than Termination Events — thereby justifying stentorian measures to recover losses and costs as a result — some Termination Events, and most Additional Termination Events — are credit- and solvency-related, thus equally deserving of the kind of opprobrium that would warrant on on-slapping of an indemnity.