Potential Event of Default - ISDA Provision: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{isdaanat|Potential Event of Default}}A {{isdaprov|Failure to Pay | {{isdaanat|Potential Event of Default}}A {{isdaprov|Failure to Pay or Deliver}} with an unexpired [[grace period]], or where the [[grace period]] has expired but the {{isdaprov|Non-defaulting Party}} hasn’t (yet) given a notice of default actually [[Accelerate|accelerating]] the default into an actual {{isdaprov|Event of Default}}. |
Revision as of 11:58, 11 July 2019
A Failure to Pay or Deliver with an unexpired grace period, or where the grace period has expired but the Non-defaulting Party hasn’t (yet) given a notice of default actually accelerating the default into an actual Event of Default.