Template:M comp disc GMSLA 10: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{2010 GMSLA Section 10 TOC}} | {{2010 GMSLA Section 10 TOC}} | ||
Difference between {{gmsla}} abnd {{pgmsla}} | |||
{{M comp disc Pledge GMSLA 10}} | {{M comp disc Pledge GMSLA 10}} |
Revision as of 18:04, 19 June 2020
- 10.1 List of Events of Default
- 10.2 Notification of Events of Default
- 10.3 Complete statement of remedies
- 10.4 No consequential loss
Difference between 2010 GMSLA abnd 2018 Pledge GMSLA In the 2018 Pledge GMSLA we wave good by to the 2010 GMSLA’s Automatic Early Termination provision — which was only really there to slake the consciences of those worried that netting might not work. In a pledged security arrangement, it is much more old-fashioned and traditional; you’re not really relying on the cute, clever-dickish type of close-out netting that is so warily eyed by ruddy-cheeked German insolvency administrators, no no need for an AET-35 unit.
To compensate, there’s a new “breach of security agreement” Event of Default at 10.1(j). Which is nice.