Transfer to Avoid Termination Event - ISDA Provision: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) m (1 revision) |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{isdasnap|6(b)(ii)}} | {{isdasnap|6(b)(ii)}} | ||
====Commentary==== | |||
Note in the {{2002ma}} there is no reference here to {{isdaprov|Illegality}} (or for that matter {{isdaprov|Force Majeure}}, which did not exist under the {{1992ma}} but would have been included in this provision of the 1992 if it had.... if you see what I mean). | |||
{{isdaanatomy}} | {{isdaanatomy}} |
Revision as of 10:20, 4 December 2012
In gory detail
|
|
Commentary
Note in the 2002 ISDA there is no reference here to Illegality (or for that matter Force Majeure, which did not exist under the 1992 ISDA but would have been included in this provision of the 1992 if it had.... if you see what I mean).