Hierarchy of Events - ISDA Provision: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{isdaanat|5(c)}} | {{isdaanat|5(c)}} | ||
What to do if the same thing counts as an {{isdaprov|Illegality}} [[and/or]] a F{{isdaprov|orce Majeure Event}} ''and'' an {{isdaprov|Event Default}} [[and/or]] a Termination Event. | |||
In which the [[JC]] thinks he might have found a ''bona fide'' use for the awful legalism “[[and/or]]”. Crikey. |
Revision as of 14:38, 3 August 2018
view template
view template
|
What to do if the same thing counts as an Illegality and/or a Force Majeure Event and an Event Default and/or a Termination Event.
In which the JC thinks he might have found a bona fide use for the awful legalism “and/or”. Crikey.