Unremedied failure to perform - GMSLA Provision: Difference between revisions
Amwelladmin (talk | contribs) Created page with "{{subst:gmslap|10.1(i)}}" |
Amwelladmin (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{ | {{gmslaanat|10.1(i)}}Excludes {{gmslaprov|9.1(b)}} and {{gmslaprov|9.2(b)}} {{gmslaprov|Loan}} terminations effected under the {{gmslaprov|mini close-out}} mechanism as a result of [[BAU]] settlement failures. This is important. | ||
{{ | |||
{{ | {{sa}} | ||
*{{gmslaprov|Mini close-out}} | |||
{{ |
Latest revision as of 12:14, 13 November 2019
GMSLA Anatomy™
|
Excludes 9.1(b) and 9.2(b) Loan terminations effected under the mini close-out mechanism as a result of BAU settlement failures. This is important.