Template:M comp disc GMSLA 9: Difference between revisions
Jump to navigation
Jump to search
Amwelladmin (talk | contribs) No edit summary |
Amwelladmin (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{2010 GMSLA Section 9 TOC}} | {{2010 GMSLA Section 9 TOC}} | ||
Paragraph {{gmslaprov|9}} of the {{gmsla}} is broadly the same in the {{pgmsla}}, only with no reference to failure by the {{pgmslaprov|Lender}} to return {{pgmslaprov|Equivalent}} {{pgmslaprov|Collateral}}, all for the sensible reason that, under the {{pgmsla}} construct, the {{pgmslaprov|Lender}} never gets its mitts on the {{pgmslaprov|Collateral}} in the first place, so is hardly in a position to fail to return it. |
Revision as of 10:34, 27 April 2020
- 9.1 Borrower’s failure to deliver Equivalent Securities
- 9.2 Lender’s failure to deliver Equivalent Collateral
- 9.3 Failure by either Party to deliver
Paragraph 9 of the 2010 GMSLA is broadly the same in the 2018 Pledge GMSLA, only with no reference to failure by the Lender to return Equivalent Collateral, all for the sensible reason that, under the 2018 Pledge GMSLA construct, the Lender never gets its mitts on the Collateral in the first place, so is hardly in a position to fail to return it.